Plugin: Project Dashboard
by GARANTIS IT Solutions Ltd.
for Polarion ALM
0.0
(0)
0 downloads
Project Dashboard for Polarion
Custom parameters & advanced visual reporting
Project Dashboard is a powerful widget that enables users to render, manage, and visualize custom page parameters. Designed for teams that require tailored reporting, real-time filtering, and data consistency across dashboards, it serves as a centralized control hub for dynamic project analysis.
With Project Dashboard, teams can define scope, select work item types, configure advanced filters, and instantly visualize data in interactive charts and tables — making it an essential tool for efficient project monitoring and reporting.
Key Features
Customizable Page Parameters
- Global Scope Settings: Easily define project scope and work item types via global parameters.
- Advanced Filters: Use enhanced parameter blocks for fine-tuned filtering and reporting control.
- Reusable Configurations: Apply the same parameter setup across multiple widgets for consistent insights.
- Validation Logic: Built-in error checking to prevent misconfiguration and ensure clean data reporting.
Visual & Interactive Reporting
- Dynamic Charts & Tables: Visualize filtered data instantly through interactive visual elements.
- Health Check Option: Identify work items missing values for selected custom fields to maintain data hygiene.
- Live Filtering Updates: Change parameter values and see all dependent widgets refresh in real time.
User-Friendly and Scalable
- Easy Configuration: No advanced technical skills required — accessible even to non-technical users.
- Flexible & Scalable: Works seamlessly for small agile teams and large-scale enterprise projects.
- Performance-Optimized: Efficiently handles large datasets without sacrificing speed or usability.
Vendor
GARANTIS IT Solutions Ltd.Published
Categories
- Wiki
Products
- Polarion ALM